Turkey |
Development plan for a stable LFG generation and collection in Gaziantep Landfill
Turkey
|
Technical Assistance
|
CEV Energy
|
2012-08-28 ~ 2012-11-28
|
Technical Assistance |
CEV Energy |
2012-08-28 2012-11-28 |
Thailand |
Clean City MSW 꽁 머니 토토
Thailand
|
꽁 머니 토토
|
꽁 머니 토토 Thai Company Limited
|
2015-12-04 ~ 2017-12-03
|
꽁 머니 토토 |
꽁 머니 토토 Thai Company Limited |
2015-12-04 2017-12-03 |
Tanzania |
Upgrading of the Port Access Road Corridors (26.5Km)
Tanzania
|
Feasibility Study / 꽁 머니 토토
|
Tanzania National Roads Agency
|
2018-06-13 ~ 2020-05-11
|
Feasibility Study / 꽁 머니 토토 |
Tanzania National Roads Agency |
2018-06-13 2020-05-11 |
Tanzania |
Consultancy Services for Detailed Egnineering 꽁 머니 토토, Preparation of Bidding Codument and Supervision of Works for Dar es Salaa
Tanzania
|
꽁 머니 토토 / Supervision
|
Tanzania National Roads Agency
|
2019-07-12 ~ 2023-03-12
|
꽁 머니 토토 / Supervision |
Tanzania National Roads Agency |
2019-07-12 2023-03-12 |
Congo |
General Plan of Rail Construction
Congo
|
Planning
|
Congo Malaysia Korea Consortium
|
2007-12-01 ~ 2008-06-30
|
Planning |
Congo Malaysia Korea Consortium |
2007-12-01 2008-06-30 |
Costa Rica |
Master Plan of Smart Transit-Oriented Development(TOD) along with the 꽁 머니 토토posed Fast Passenger Train Route(FPT) in the Greater M
Costa Rica
|
Master Plan
|
Ministry of Land, Infrastructure and Transport
|
2020-06-22 ~ 2021-04-18
|
Master Plan |
Ministry of Land, Infrastructure and Transport |
2020-06-22 2021-04-18 |
Costa Rica |
Detailed 꽁 머니 토토 for Garabito Solid Waste Incineration Plant
Costa Rica
|
꽁 머니 토토
|
KIC
|
2019-02-13 ~ 2021-04-30
|
꽁 머니 토토 |
KIC |
2019-02-13 2021-04-30 |
Cambodia |
Urban Infrastructure (Sewage Treatment System) Development 꽁 머니 토토 for Clean Siem Reap Cambodia Feasibility Study
Cambodia
|
Feasibility Study
|
The Export-Import Bank of Korea
|
2019-12-25 ~ 2020-06-24
|
Feasibility Study |
The Export-Import Bank of Korea |
2019-12-25 2020-06-24 |
Cambodia |
Feasibility Study of Waste Water Treament Plant and River Managment 꽁 머니 토토 on Seam Reap, Cambodia
Cambodia
|
Feasibility Study
|
The Export-Import Bank of Korea
|
2008-04-08 ~ 2008-07-07
|
Feasibility Study |
The Export-Import Bank of Korea |
2008-04-08 2008-07-07 |
Cambodia |
Detailed Design and Construction Supervision for the Construction of Siem Reap Sewerage System and Im꽁 머니 토토vement of Siem Reap Riv
Cambodia
|
꽁 머니 토토 / Supervision
|
Ministry of Public Works and Transport
|
2010-07-01 ~ 2014-09-30
|
꽁 머니 토토 / Supervision |
Ministry of Public Works and Transport |
2010-07-01 2014-09-30 |